Your Questions Answered

Q & A

What are the hours of operation for the Navan and Expansion Site?

The proposed hours of operation are normally from 7am – 7pm for operations such as drilling, excavation, processing and shipping, from Monday to Friday. Shipping only is permitted to begin at 6 am.

What types of products are produced at the Navan Site? What are they used for?

Products produced at the Navan Quarry are mainly used in asphalt, concrete and road base projects.   These products are used in local projects in the Eastern Ontario area.

What is the current haul route? What are your shipping volumes right now? Are they expected to increase because of the expansion?

The products produced at the Navan Site serves the local Eastern Ontario market.  Products leave via Rockdale Road to Colonial Road and predominantly are destined for the Orleans area and other locations on the eastern side of Ottawa.  Annual shipped tonnages have ranged from 400,000-700,000 per year, and depend greatly on economic need.  Lafarge expects that the historic shipping rates to remain the same with the proposed Extension.  There is no new proposed entrance anticipated for the new quarry. All traffic will continue to  Colonial Road via the existing Rockdale Road entrance.

You are extracting below the water table. What is the potential to impact the quantity or quality of available water in my well? Will there be any water monitoring?

The aggregate extraction and production processes do not use any chemicals.  The industry is considered a clean industry and therefore the risk to water quality is low.  However, there is large equipment that requires fueling, and there is the possibility of spills on site. Lafarge has a Spills Action Plan that ensures spills are handled according to Provincial regulations.  This Spills Plan is currently implemented at the existing quarry and will be at the Extension site as well.  In regards to water quantity/quality, our technical reports have ensured us there will be no impactful water drawdown of any neighbouring wells or change in water quality. In the event of a well interference complaint, Lafarge will implement a Complaints Response Program that has been designed by our hydrogeological consultant.

Is Lafarge required to rehabilitate the Navan Quarry and proposed expansion? What is the planned final rehabilitation plan?

All licenced aggregate sites in Ontario are required to be rehabilitated on a progressive and final basis. Lafarge proposes to beneficially re-use excess soils from construction projects by filling the quarry excavation in order that the site can be reforested.

How can I be involved in the application process?

We invite members of the community to be involved in this process and we would appreciate your comments. The application information will be posted to the Environmental Bill of Rights website for public review. Please contact Chris Galway, Land Manager at chris.galway@lafargeholcim.com should you have any questions about our proposed Navan Quarry Extension or any other aspects of our operation.

Don’t see your question? Click here to contact us.